Summary: Remote Monitoring With PLC-SCADA Of The Generator Group Has 1500 KVA Power, and 6.3 KV Output Voltage, and Its H.V. BreakersIn recent years, monitoring and control systems realized with SCADA has been gainning popularity. SCADA systems are commonly used in industrial systems aselectricity energy generation, transmission and distribution, production processes in factories, water, petroleum and gas distribution. The reason is that SCADA has capabilityof collecting monitor and records of all the processes in one center, saving time and manpower. In this study, the automation of a system including generator and high voltagebreakers is examined and a remote monitoring SCADA software is developed. In chapter one, SCADA technologies are examined, the fundamental components ofthe control units of SCADA systems are mainly taken up as blocks, and it is detaily emphasized on SCADA communication methods, required techniques, standards andcommunication protocols. In chapter two, an automation system including two generator group with dieselengine has 1500 kVA power and 6.3 kV output voltage and the high voltage breakers belongs to this generator group is examined in detail, comprehensive information is givenabout the components of the system, and an example remote monitoring SCADA software developed for this automation system is introduced.Key Words: SCADA Systems, Automation Systems, PLC, Electricity Energy |