M.Sc. Tezi Görüntüleme

Student: Tahsin BOZTOPRAK
Supervisor: Associate Professor Osman DEMİR
Department: Harita Mühendisliği
Institution: Graduate School of Natural and Applied Sciences
University: Karadeniz Technical University, Turkey
Title of the Thesis: Consideration of Culture-technics Features of Land Consolidation Study in terms of Sustainable Land Management: a case study of Kayseri
Level: M.Sc.
Acceptance Date: 27/12/2010
Number of Pages: 85
Registration Number: i2269
Summary:

      

The effects of seven-unit single proprietorships to the the number of parcels per farm, ratio of consolidation, enterprise size, the shape of the parcel, the boundary loss, participating state, road network, transport, and expropriation have been studied and searched. In addition; to confirm the sequences of the needs of working time on each chosen enterprise unit model, the effects of seven-unit single proprietorships to the working time of handling farms, processing time, the number of labor force, the preparation period, the path duration, total duration of study, the effect of working time and total length of road between the actuation center and enterprise were searched and investigated.

       After the land consolidation project, the total number of individual holdings per farm parcel has been reduced 35.18% on research units. Consolidation ratio is 35.39%. Business area has been an increase in the rate of 45.84% in width. The ratio of parcels which have a rectangular shape increases from %43,63 to % 73,44. An income at %22,26 ratio has been gained on the areas which can not be farmed because of approach problem on parcel border. Single proprietorship ratio is increased at %2,30 by consolidation. The total length of transportation network has been increased at ratio of %102,86. The number of parcels which benefit from road netwok directly has been increased at a ratio of %36,11. At least 1.913.348,22 TL savings have been achieved from expropriation. On processing time %72,52 saving, on duration of working day %59,85 saving, on prepation time %50,81 saving, on lead time %44,80 saving, on total prepation time %30,49 saving have been gained on chosen enterprise unit models. Saving at ratio of %56,24 has been achieved on the total road length between the enterprise and actuation centre.

Key Words: Land Consolidation, culturtechnic, Run Time Reqirement.